PV buttress at Locust Hill / 12.
Forming of buttress begins
Forming of he buttress
itself and of the low walls that connect it to the circular wall around it
begins here.
Note that in a more typical installation, the low wall sections along with
the curved wall outside them would be omitted entirely,
and the buttress would be reduced very significantly, down to almost nothing
for a low elevation .